top of page
浴室 612x612  3.jpg

Bathroom Renovation

Renovating a bathroom is the most complex of all renovations. The space is small, but it involves the most people to complete. Communication and coordination with a skilled team are key to a successful bathroom renovation. It involved a high level of coordination/communication with many materials sourcing, waterproofers, electricians, tilers, installers, painters/plasterers, plumbers, demolition team and Auckland Council. Whether you are looking for a classic or contemporary style for your bathroom renovation, the process is the same and we coordinate the overall construction.

割草 612x612 8.jpg

Landscaping & Outdoor List

Gates and Fences

  • Driveways

  • Electric Gates

  • Automatic and Manual Gates

  • Fences

  • Security System

  • Columns 

Landscaping 

  • Gardens

  • Lawns and Grass Design

  • Pavements

  • Walkways

  • Vegetable Gardens

  • Retaining Walls

Outdoor Living 

  • Deck with automatic Louvres

  • Pergolas

  • Swimming Pools

  • Outdoor Cooking

  • Outdoor Lighting

  • Plumbing and Design

Landscaping List

01

02

Why did you renovate your bathroom?

Personalized bathroom renovation packages tailored to your needs
If your bathroom is outdated, you can personalize it your way

Increase the sales value of your home

Give the bathroom more beauty

To increase functionality and usage

Need more storage space

Add luxury/modern amenities

Bathroom leaks or floor rot for safety reasons

Increase space by knocking down walls and redesigning the layout

kitchen renovation, bathroom renovation, Auckland house renovation

Image by Cameron Smith
Why renovate outdoor
全屋装修 Logo 612x612.jpg

03

3 Reasons Aucklanders Choose Us

What makes us different from others?

1. Design, renovation and project management, personalized renovation projects.
From the first initial consultation, through the design process, picking out accessories/supplies, managing the project, all the way to handing over the keys - we take care of every step of the process so you can focus on the enjoyable parts of transforming your home .

We understand that every home improvement is different, and we understand that every client and every home is different. Our flexible and unique operational management allows us to adapt to various situations without compromising efficiency and quality.

2. 3-stage quality assurance process
Workmanship and service delivery are not to be taken lightly and the 3 stages (Team Member, Team Lead and Project Manager) confirmation sign off is what closes the process before your final sign off.

3. Customer experience is our core
Our systems and processes today are defined by being customer-centric and treating each customer as their own thing, not just a transaction.

Choose Us
Renovation FAQ

04

Renovation FAQ

全屋装修 Logo 612x612 15.jpg

Can I choose fixtures and fittings? Can I provide it myself?
Absolutely - If you want to buy anything directly and provide installation at the right time, we have no objection, but we always recommend customers to choose our suppliers for many reasons, we are confident in the quality and we can manage the shipping better and prices, and any troubleshooting during the renovation is easier because we can be contacted directly.

Do I need to hire other types of workers during decoration?
Generally, we use and trust a long-standing network of suppliers. This just makes decorating a lot less stressful and less expensive. Home renovations typically require 8 to 10 different trades, and if any one of them is unreliable, it affects all the other trades involved. Therefore, if a client wishes to use trades alone, we do not agree to this.

How long does a kitchen renovation take?
Generally a kitchen refurbishment will take place within 5-6 weeks from the date of demolition and this assumes the design is complete and the parts have been manufactured (excluding splashbacks which require additional fabrication time)

 

How long does a bathroom renovation take?Generally speaking, bathroom renovations need to be carried out within 3-4 weeks from the date of demolition, but if consent is required it can take longer.How to plan house decoration?Start by calculating exactly what you want to complete, then get a detailed scope of work from your renovation company. A full-home renovation can take anywhere from 3 to 6 months, depending on the scope, complexity, and size of the renovation.How much does it cost to renovate a whole house?The average Auckland full house refurbishment (including bathrooms and kitchens) costs between $80,000 and $160,000, depending on the size of the house, building requirements, choice of products/fittings and many factors.Do I need a building permit for my renovation?If you are undertaking building work, you may need to apply for a building permit. For example: Any structural building including new builds, extensions, alterations, outbuildings (sheds) and re-piling changes to the original pipes and drainage system site works on the building retaining walls exceeding 1.5 meters in height, or near the top There is a fence where the retaining wall of a building or driveway is higher than 2.5 meters above the fence and any swimming pool fence where the pool deck is more than 1.5 meters above the ground.If in doubt, we recommend calling your local council and discussing your project with them.

bottom of page